Service
Net metering and net billing, filed for you
We prepare and submit the LESCO or MEPCO application, manage the inspection and hand you the sanctioned agreement.
- DISCOs
- LESCO and MEPCO
- Export rate
- About PKR 11
- Import rate
- PKR 37 to 55
- Connections delivered
- 200+
February 2026
What changed, in plain terms
NEPRA replaced net metering with net billing. Under the old regime, a unit you exported was credited against a unit you imported, one for one. Under net billing, exported units are purchased from you at a rate close to PKR 11, while imported units continue to be charged at the normal domestic tariff of roughly PKR 37 to PKR 55.
Systems sanctioned before the change were grandfathered on the old terms. There is an important qualification: applying to enhance the capacity of a grandfathered system moves that connection onto net billing. If your system predates February 2026, adding panels can cost you the arrangement you already have. Adding storage generally does not.
We file these applications regularly for both LESCO and MEPCO, so the process below reflects what actually happens rather than what the guidance says should happen.
The rates that now apply
- Export buyback
- PKR 11.33
- Import tariff
- PKR 37 to 55
- Connections delivered
- 200+
- When the rules changed
- Feb 2026
What the grid pays you per unit
What you pay the grid per unit
LESCO and MEPCO
Net metering became net billing
Systems sanctioned before February 2026 keep the old terms, but applying to enhance capacity moves the connection onto net billing permanently.
The process
How an application runs
- 1
Documentation
Ownership documents, CNIC, a recent bill and the system design are assembled. Missing paperwork is the most common cause of delay.
- 2
Application and fee
The application is submitted to your DISCO with the licensing fee. We track it rather than leaving you to follow it up.
- 3
Inspection
The DISCO inspects the installation against the submitted design. We attend, so questions are answered on the spot.
- 4
Meter and agreement
The bidirectional meter is installed and the agreement is issued. You receive the sanctioned documents as part of handover.
Net billing questions
What changed in February 2026?
Should I still apply?
My system predates February 2026. Am I protected?
How long does approval take?
What documents do I need to provide?
What does the application cost?
Who installs the bidirectional meter?
Can I get net billing on a rented property?
Does LESCO differ from MEPCO in practice?
If your system predates February 2026, talk to us before you apply
Applying to enhance a grandfathered connection moves it onto net billing permanently. Adding storage usually does not. It is worth ten minutes to establish which case you are in.