Multan
Solar company in Multan
Our Bosan Road office, MEPCO applications filed in-house, and the 250 kW Toyota Multan Motors installation as a local reference.
- Office
- Bosan Road
- DISCO
- MEPCO
- Flagship
- Toyota Multan, 250 kW
- Monthly saving
- PKR 1.05m
Local context
Heat is the design constraint in Multan
Multan runs hotter than Lahore for longer. That matters more than most proposals admit, because both inverters and batteries lose usable capacity as ambient temperature rises, and a system specified for a milder climate will underperform its datasheet here.
It changes equipment selection and it changes placement. It is also the reason the Citadel cabinet is liquid cooled rather than passive: passive cooling does not hold capacity through a Multan summer.
Our Bosan Road office covers the city and the surrounding districts, and MEPCO applications are prepared and filed by the same team that designs the system.
Local reference
Toyota Multan Motors, 250 kW
Our largest commercial installation in the city is a 250 kW rooftop array across the dealership and workshop roofs at Toyota Multan Motors.
It generates approximately 875 units per day and reduces the monthly electricity cost by around PKR 1.05 million. Those are metered figures rather than modelled projections, which is the standard we hold commercial proposals to.
Questions from Multan customers
Why does Multan need a different design from Lahore?
Will my battery cope with a Multan summer?
Do you have a local presence or do you travel from Lahore?
What is your largest project in Multan?
How does MEPCO compare with LESCO for net billing?
Does dust affect systems here as much as smog does in Lahore?
Heat is the design constraint in Multan, so design for it
Panel derating, inverter placement and battery cooling all matter more here than in Lahore. Our Bosan Road office and the 250 kW Toyota Multan installation are both local references.