Skip to content
PENTA-H Renewable Energy

Free site survey

An engineer visits before anyone quotes a price

We measure your roof and your consumption, then produce an itemised quotation with every line explained. The survey and the quotation cost nothing.

Survey
No charge
Quotation
No charge
Visit length
About an hour
Coverage
Lahore and Multan

Why a survey first

A system sized without seeing the site is a guess

Two houses with identical bills can need very different systems, because what matters is when the power is used, not how much of it. That is why we measure before we quote.

The visit takes about an hour. The engineer looks at your roof, its orientation and shading, your distribution board, and your consumption pattern across a recent billing period. You get the design and the quotation afterwards, and you are under no obligation.

Request your survey

Optional, but it lets us prepare before the visit.

Are you considering storage

We confirm the appointment within one working day.

What happens

Four steps, no obligation at any of them

  • 1. We confirm

    We call or message to agree a time that suits you, usually within one working day of your request.

  • 2. The visit

    About an hour on site. Roof, orientation, shading, distribution board and your consumption pattern.

  • 3. The design

    An engineer sizes the array, the inverter and any storage together, against your load rather than your bill.

  • 4. The quotation

    Itemised, with every line explained, so you can compare it honestly against anything else you have been sent.

Before you book

What people ask about the survey

Is the survey really free, and is there a catch?
It is free and there is no obligation at any point. We would rather spend an hour establishing that a site is not worth doing than sell a system we would be embarrassed to revisit in year three.
How long does the visit take?
About an hour for a house. The engineer looks at the roof, its orientation and shading, your distribution board, and your consumption pattern across a recent billing period.
Do I need to be there?
Someone who knows how the household uses power should be, because that conversation is the part that decides the design. Access to the roof and the distribution board is the practical requirement.
What should I have ready?
Your last three electricity bills if you have them, and a rough sense of what runs in the evening. Neither is essential. Both make the visit more useful.
Who turns up, a salesperson or an engineer?
An engineer. That is deliberate, because the answers you get at the first visit are the ones the design will actually be built on.
When do I get the quotation?
Within a few working days, itemised, with every line explained so you can compare it honestly against anything else you have been sent.
Do you survey outside Lahore and Multan?
For residential work, anywhere in Pakistan where the visit is practical. Beyond our two cities we will be straight with you about what maintenance and warranty support would realistically look like.